- Duration: 200 hours
- Year: 2025
- SACEN Technology S.L. y CIFP SANTURTZI LHII
- Industry 4.0 and advanced manufacturing
Project description
The “SMART CABINET 5G” equipment is assembled in the factory according to the teleoperator’s specifications, transported and placed with a crane on the roof of buildings, or in rural areas, making installation very easy and also reducing space requirements and visual impact.
It has five cabinets/modules that house the different RACs of telecommunications equipment.
One of the biggest operational problems that can arise is the high temperatures that can be reached in these cabinets/modules.
The idea behind the project was to create an “ad hoc” extraction system that not only solves the thermal problem but also functions as a safety element by extracting the smoke produced in case of small fires.
To achieve this, an independent extraction was carried out for each cabinet/module, evacuating the flow to a common extraction point outside, with the aim of minimizing energy consumption.
In short, zone cooling will extend the lifespan of equipment and achieve greater energy savings.
Tasks Performed
- Create sketches, drawings and 3D models using software
- Dimensioning of the extraction system (measurements taken inside the cabinet)
- Preparation and manufacture of the extraction hoppers
- Partial assembly of the system in the workshop (using both fixed and non-fixed fastenings)
- Final assembly of the cabinet
- Test the cooling system in the “SMART CABINET 5G”