- Duration: 157 hours
- Year: 2025
- Participants: BLASENEA E.Z. eta OTEITZA Lizeo Politeknikoa LHIIP
- Industry 4.0 and advanced manufacturing
Project description
This project stems from the need to optimise and improve the ergonomics of one of the operator’s tasks, specifically the process of compacting the soil in the planters.
Currently, this task is carried out manually after the planters have been washed, which involves considerable physical effort and can lead to accumulated fatigue and potential future injuries for the operator.
Firstly, the design of the machine was addressed, based on a preliminary study of the geometric characteristics of the planters to be used.
Solid Edge software was used to develop the design, enabling the creation, simulation and validation of the various system components prior to manufacture.
As for the manufacturing resources, various pieces of equipment and tools were considered, notably a milling machine and a lathe for machining parts, as well as 3D printers for manufacturing components. Following the manufacture of the components, assembly tools and measuring equipment were used to ensure the correct assembly of the whole unit.
The assembly was delivered to the company, which has successfully validated it.
For the worker responsible for filling and compacting the planters, ergonomics have been significantly improved, helping to prevent future injuries.
Furthermore, the time spent working on each planter has been reduced, thereby improving productivity.
Tasks Performed
- Agree the machine’s specifications with the company
- Design the machine
- Carry out the manufacturing process
- Once the machine has been installed at the site, carry out tests to verify that it is operating correctly
- Visit the company and carry out the final tests