- Duration: 4 months
- Year: 2021
- Participants: SALESIANOS URNIETA + DEFLASTRAT
- Energy and environment
Project objectives
In this project, the redesign and adaptation of the coil feeding system in a rolling mill for biosanitary products has been carried out.
In addition, they also want to adapt and improve different sections of the company in terms of safety (risk due to the precarious state of the electrical installation) and accessibility. To this end, the design, assembly and commissioning of a loading station for a forklift, compressor feed and a work table will be carried out.
Tasks performed
- Redesign and adaptation of the coil feeding system:
- Analysis of the current feeding system.
- Identification of critical points for improvement.
- Redesign of the structure.
- Manufacture of the structure.
- System commissioning.
- Installation for fork-lift truck loading station:
- Calculation of section and sizing of the installation according to forklift power.
- Installation of protection panel with socket for loading station.
- Installation of rigid pipe from existing tray to loading station.
- Fixing of hose by tube and existing tray in the pavilion.
- Installation of surface Schuko socket for forklift truck charging.
- System testing and commissioning.
- Installation for compressor and workbench power supply:
- Calculation of section and sizing of the installation.
- Installation of protection in existing frame for compressor and socket.
- Installation of rigid tube from control panel and protection.
- Installation of metal strap for fastening of aerial Schuko socket.
- Installation of aerial Schuko socket above the work table.
- Commissioning and testing.